|
| color = | logo = | logo_width = | logo_alt = | image = Bangkok Skytrain 2011.jpg | image_width = 300px | image_alt = | caption = Skytrain approaching Nana Station | type = Medium-capacity rail transport system | system = BTS Skytrain | status = Operational | locale = Bangkok, Thailand | start = Mo Chit Station | end = Bearing Station | stations = 22 | routes = | ridership = 600,000 (2012) | ridership2 = | open = December 5, 1999 | close = | owner = Bangkok Metropolitan Administration (BMA) | operator = Bangkok Mass Transit System Public Company Limited | character = | depot = Mo Chit | stock = Siemens Modular Metro | linelength_km = 22.25 | linelength_mi = | linelength = (32 km under-construction) | map_state = expand | map = | box_width = auto |gauge = |speed = |el = Third rail}} The Sukhumvit Line ((タイ語:รถไฟฟ้าบีทีเอส สายสุขุมวิท)) is a route of the BTS Skytrain in Bangkok, Thailand. From the central Siam Station, where it connects with the Silom Line, the elevated rail line runs northwards along Phaya Thai and Phahon Yothin Roads to Mo Chit Station (N8) in Chatuchak District, and eastwards along Rama I, Phloen Chit and Sukhumvit Roads to Bearing Station (E14) in Bang Na District. The line originally consisted of seventeen stations (from Mo Chit to On Nut) when the BTS first opened in December 1999. A planned station at N6 has never been built. The line is represented on the official BTS map in light green. ==Stations== 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Sukhumvit Line」の詳細全文を読む スポンサード リンク
|